ArcGIS REST Services Directory Login | Get Token

Generate KML (EngineeringOnline)

Layers:
    Traffic(0)
      Signs(1)
      Traffic Signals(2)
      Traffic Studies(3)
      Crash Reports 2017 - Dec 19, 2020(4)
    Transportation(5)
      Transit Routes(6)
      Bus Stops(7)
      Truck Route(8)
      Non-Motorized Network (Current)(9)
      Non-Motorized Network (2006)(10)
    Non City of Battle Creek(11)
      Emmett 10 Yr Plan(12)
      Pennfield 10 Yr Plan(13)
      Springfield 10 Yr Plan(14)
      Bedford 10 Yr Plan(15)
      Emmett LRP Phase 1(16)
      Emmett LRP Phase 2(17)
      Emmett LRP Phase 3(18)
    Construction Projects/Planning(19)
      2023 Road Treatments(20)
      2024 Road Treatmemts(21)
      2025 Road Treatmemts(22)
      2026 Road Treatments(23)
      2027 Road Treatments(24)
      2028 Road Treatments(25)
      2029 Road Treatments(26)
      2030 Road Treatments(27)
      2031_Road_Treatments(28)
      2032 Road Treatments(29)
      2033 Road Treatments(30)
      2034 Road Treatments(31)
      2035 Road Treatments(32)
      2036 Road Treatments(33)
      2037 Road Treatments(34)
      Soil Borings(35)
      Past Paving 2014 thru 2023(36)
      PASER Scores (2022)(37)
      Future LSLR Neighborhoods(38)
    Sewer(39)
      Future Outside Jurisdiction Televising(40)
      Sanitary Televise Year(41)
      Lift Station Improvements(42)
      1 Month Sewer Badspots(43)
      3 Month Sewer Badspots(44)
    Utilities and Contours(45)
      2 Ft Contours(46)
        Northeast(47)
        Northwest(48)
        Southeast(49)
        Southwest(50)
      Water Distribution(51)
        Hydrant(52)
          Hydrant(53)
          (LABELS) Hydrant(54)
        Water Valves(55)
          Water Valve(56)
          (LABELS) Water Valve(57)
        Control Valves(58)
        Water Fitting(59)
        Water Service Valve(60)
        Water Main(61)
        Water Casing(62)
        Water Service Fitting(63)
        Water Service Line(64)
        Water Tower(65)
        Meter Pit(66)
        Abandoned Watermains(67)
        Abandoned Water Structures(68)
        Water Pressure Boundary(69)
      Sanitary Sewer(70)
        Sanitary Structures(71)
        Lift Stations(72)
        Sanitary Fittings(73)
        Sanitary MunicipBoundaries(74)
        Sewerline(75)
        Sanitary Cleanout(76)
        Sanitary Service(77)
        Abandoned Sewerlines(78)
        Abandoned Sanitary Structures(79)
        1 Month Badspots(80)
        3 Month Badspots(81)
      Storm Sewer(82)
        Storm Manhole(83)
        Storm Inlet(84)
        Storm Outfall(85)
        Storm Fitting(86)
        Storm Main(87)
        Roof Drain(88)
        Drainage Districts(89)
    Base Layers(90)
      Parcels(91)
      Recycling Pickup Days(92)
      Garbage Pickup Days(93)
      NPC Boundaries(94)
      Maintenance Districts(95)
      Municipal Boundaries(96)
      Aerial Tile Grid (2015)(97)
      Aerial Tile Grid (2020)(98)
Layer Options: